Saturday, March 7, 2020

We've Come a Long Way Baby!

You might think we've been doing a lot of work on the cottage over the last month or so and I just haven't posted about it. We haven't. In fact, we haven't even been up to the property but a few times this year. That is until this last week. Michelle, Gavin and I went up last Sunday and just came home this morning. In five days we:

  1. Finished the exterior trim, paint and stain.
  2. Finished all of the plumbing and hooked up our temporary water and septic.
  3. Installed the floor tile.
  4. Installed the shower tile.
  5. Installed the kitchen back splash.
  6. Sanded, stained and sealed the loft floor.
  7. Stained and sealed the kitchen ceiling.
  8. Lacquered the bathroom ceiling. 
  9. Put the final coat on all of the walls and ceilings.
  10. Finished the loft railing.
  11. Installed the bathroom vanity.
  12. Installed the shower fixtures.
  13. Installed the toilet.
  14. Built, primed, painted and installed the kitchen cabinets.
  15. And many more little things!
There's still more to do; about another weeks worth. But it sure is coming along nicely! Just two blog posts ago we were only at the sheet rock stage!

We still have kitchen cabinet doors and drawer slides yet to install, a built in bathroom cabinet for linens and to house our washing machine, the loft closets and entertainment center cabinet to build, baseboards and door trim to install, kitchen upper shelving and kitchen counter tops to put in as well as all of the cool light fixtures and other awesome details. 

We have all of that ready to go, we just need more time. The plan is to go back up in two weeks and push hard for the finish. Next up, the outdoor kitchen and entertainment area and I can hardly wait! Then it'll be an all call for a party and sign up as Fireside Trails and Retreat will officially be open!

Paint and stain complete!


This is the the side the outdoor kitchen will be on.
My smoker is patiently waiting to be surrounded by the full outdoor kitchen.
We found the sign above the door at a local brewery's art bazaar.
It's only temporary while we wait to get the well driller in after the rain has stopped.
What you see when you step in the door. (If the ladder is out. It's on casters and pushes straight up too!)
Full size kitchen.
Everything is turning out just as we envisioned.
Our current living room furniture was designed by Academy Sports.
Bathroom has a cool white lacquer ceiling finish.
Can't really tell but the vanity has three drawers and a sliding barn door.
Subway tile with charcoal grout.
The loft is really shaping up too.
Not a bad way to spend a night.
The view out of the rear loft window is as good as any.

Can't wait to continue with the details!

















Tuesday, December 24, 2019

One Great Big Colossal Waste of Time

Why, internet? Why!? I can't believe that after all of these years I finally fell victim to believing something I saw on the internet was true. That never happens. Not to me. I always do my due diligence. But this time, the shit planets aligned and what I thought was a popular and simple solution to a problem was not.

We want to do everything we can ourselves. Drilling a water well not excluded. I know it sounds like a huge undertaking, and it is, but we're the Scribners. So I did a ton of research; you know, the real kind. The internet kind. I found there's a thing called a sand point. It's a four foot long tube with holes in the sides covered with fine screen. On the end of this tube is a heavy point. This tube connects to a length of steel pipe. Then a fence post driver or sledge hammer is used to beat the point and pipe into the ground by hand like a giant nail. Once the pipe is close to the ground, another pipe is screwed on and the process starts over again until you reach a depth of about 25 feet. This method is widely used in sandy soils in areas where the water table is high. That, I thought, is exactly our conditions. After all, you've seen the pictures and videos of our wet land. During wet seasons it seems like our water table is at 2 feet.


Sand points, drive caps, heavy couplers and all other components to this system are widely available from multiple manufacturers. I ordered mine from Home Depot. And they're relatively inexpensive too. Especially when we were hearing tales of a deep well in our area costing $10,000.00! Now granted even with a high water table a hand driven sand point well will not yield a ton of water, BUT there are plenty of videos online of folks driving one and having ample water to flush toilets, wash dishes and even take showers. Our small cottage should do just fine on a shallow well.

I watched many videos of people hammering away at their sand points. Some are 2 minutes long and others are much longer. The common complaint I derived from my research was simply how labor intensive it was. So what? I'd be happy to get after it. So we purchased everything we needed and got to it.

The first thing no one tells you is you will fuck up your pipe thread. No question about it. After we drove the first 6 feet the threads where the drive cap (a heavy steel cap screwed on the top of the pipe to hammer against) were driven inside themselves and folded under.

Enter a high dollar set of pipe threading tools.

The second thing no one tells you is the drive cap will crush from the heavy pounding.

Buy several extra drive caps and continue.

The third thing and granted, I knew this upfront, it's VERY LABOR INTENSIVE AND TIME CONSUMING. I thought I could handle it. No fucking way. It'd kill anyone who tried. At least it would in my soil. Which brings me to the fourth thing...

All conditions will be different. Any videos or blogs or testimonials online only know of how it went for them, and no one posts failures. I thought my soil was sandy. It is. After about 20 feet of sticky clay and hard rock. Driving by hand on my property proved to only destroy pipe, couplings, caps, threads, my back and most of my family relationships.

So we put it on hold. And while we continued to build on the cottage my dad decided he could whoop the well and began building a small drilling rig for me with the idea that we could drill the hole and then drop the sand point directly in. Voila. No hand driving. This gesture was massively impressive and very much appreciated. I'm very lucky to have such a dad.

This rig is quite impressive, but not as impressive as my dad himself.
As we drilled we saw the excavated soil changing colors and textures eventually becoming a wet cornmeal like sand.
We pulled the pipe we had already driven by yanking on it with my tractor's front end loader along with car jacks. About the only thing harder than driving this goddamn thing is pulling it. After we wrestled it out we used my dads rig and drilled to 25 feet and dropped the sand point back in, which stopped at about 18 feet or so for some unknown reason. So I drove it by hand fairly easily to its max depth. Of course, we had to re thread the top pipe after it collapsed from even moderate driving then we finally and anxiously hooked up the pump. No water.

We used the tractor and jacks to muscle out the pipe again and could find nothing wrong. Per my research I installed a check valve at the top side near the pump. While the pipe was pulled, I decided to move the check valve to the bottom just above the point thinking that would aid in priming the well. Excited again we tried to drop it back in the hole but it only went in about 6 feet and stopped. The well had collapsed. As did my boner. There was no way I was driving it further so we quit yet again.

After a few weeks, I decided to re drill the well one final time. As requested by my wife, this time I went deeper. But I noticed while drilling that I could pull the drill pipe up about 6 feet from the bottom and when I would lower it, it would begin to drill the bottom 6 feet all over again. That's when I realized my well walls were collapsing while I was drilling. I could drill about 16 feet or so and the cuttings would flush out. But below that, sand would just collapse and settle in around my bit. I could never go any deeper without it filling itself back in. So I pulled the drill pipe and decided to try to drive it again. I placed the sand point and 25 feet of pipe down until it stopped. We had to hand drive about 8 feet. Which we did, again, just for fucking fun. We filled the pipe with water, hooked up the pump, primed it and this time... no goddamn water. It's as if the bottom of the well is completely clogged or at best like trying to drink a milkshake through a tiny coffee stirrer. It is decided that the internet is a liar and it should be destroyed.

Hard to tell I was an inch away from setting everything on fire.
We pumped water from one of our nearby ponds to the drill site.
The water was pumped about 200 feet from the pond to the drilling rig.
Having now given up for the final time I decided to call a local well drilling service and see for myself what the damage is going to be. WHICH I SHOULD HAVE DONE MONTHS AGO. I quickly learned that unlike the internet, actual professionals can honestly answer questions easily and directly about my exact situation and geographical location. I learned the most the moment I told them where I was located. The receptionist quickly said "Oh. He won't drill in that area. It's too difficult".  She went on to say that they use air drillers and that my area was too sandy and wet for that method. I'd need a mud driller which they don't use and which is essentially what my dad built. Except in order to get it to work in this sandy soil I'd need to mix bentonite with the water I pump down the drill pipe to solidify the well walls so the sand doesn't collapse. OH! Easy!

No. Not easy. It's never going to happen. So I called a second local well driller who as it turns out has air drillers, mud drillers and air and mud drillers and is ready and willing to take us on! Hallelujah! He actually drilled the well closest to us, remembers it is 180 feet deep and knows the area well. I told him what I had been doing and he laughed. He said the sand point would have worked if I was about a mile closer to the river but where I am, no fucking way. I told him I wanted a deep well and he asked what I considered deep as he recently drilled 750 feet! I'd like to go 150 - 200.

One reason we wanted to do this ourselves was financial, being we heard rumors that a well would be around $10,000.00. So when we got his quote of $22 per foot with a $2000 minimum my boner came back so strong I opened a paint can with it and got back to work.

Fucking with that damn sand point to date between myself and my dad cost nearly as much as what my new 100+ foot deep well is going to be. What a great big colossal waste of time.

We are tentatively on his schedule to drill in late January, weather permitting. The only caveat is that his rig weighs 60,000 pounds and if our land is not completely dry at the time he will sink like a stone. So we'll see what it do.

In the meantime, we are full stream ahead - pun intended - and currently working on finishes in the cottage! Can't wait to show you all the finished product! I may even include a pic of me running through fountains of sprinklers where it's hard to tell which is more glorious, the plentiful water or my raging boner.




Monday, December 16, 2019

Catching Up

It's been a while since I posted. Between vacations and work, including working on the cottage, I just haven't had the time. So this episode is to bring you up to speed.

We last left our hero's having just finished up framing and drying in the cottage. A lot has happened since then...

The next thing we did was get the roof on...

You're looking directly across to where the main cabin will be built.
get the windows in...


and get the fascia, soffit and siding on.


Then we were able to frame the interior walls, lay the floor on the loft and install the two large windows.



We built the loft large enough for a Queen bed on one end.
These large windows let a ton of light in!
After that, we added the front porch, cedar shingle siding and more trim.

This pic of Michelle working on the windows shows the scale of the cottage pretty well.
Roofing the porch.

Michelle enjoying the fruits of her labor.
Our first sunrise on the new porch.

Ready for paint and stain!
All that took two weekends. Then we began the electrical, plumbing and insulation!



Next came sheetrock.



The bottom of the loft floor/kitchen ceiling will be stained.

We're now ready for tape, bed and texture. Then floors, cabinets and trim. Then paint and we're in!

We are also currently in progress on the well and septic. 

Plans are to be moved in and 100% complete including the outdoor kitchen, which we have not started yet, by the end of February.

We're so excited to get this project complete! Once we are wrapped up we plan to take a few months off to enjoy it before we start the big cabin!




Sunday, September 29, 2019

Building The Guest Cottage

Excitement has really set in! Michelle and I scheduled off last Wednesday through Sunday to begin building the guest cottage. Gavin and my parents both volunteered to come help us, which as it turns out we really needed the extra hands!

We started Wednesday morning by using the tractor and auger to dig our holes for our foundation piers. The ground was super hard and it wasn't easy, but we managed to dig and pour all 12 of them. We then began work driving our shallow well, which I'll let you know all about in a later post when it's complete.

Thursday morning we began the floor joists and subfloor. The cottage is 15 x 15 with an 8 x 15 loft for a total of 345 square feet.





By the end of the day we had all the sub floor, first floor walls and the loft up. It was a great day with a ton of progress. We knew the rain was coming up from Houston so we battened down the hatches for the overnight.



Friday the rain had arrived. It dumped 3 inches that morning and flooded everything.


But by noon the rain moved out and the ground was so dry it practically all soaked up in a matter of minutes. We started on the second floor walls around 1 that afternoon and then began setting the ridge beam and a few rafters. We finished more than was expected for the day considering the weather.





Saturday we were able to put up the remaining rafters and first floor wall sheathing. We were then able to install the roof deck and by now I had failed every single test of patience and was working on one hell of an attitude. It was a lot of long hard, hot and humid days of work and we were all wearing on each others nerves. 




At the end of the day Saturday my folks and Gavin had had enough of my bullshit and decided it was time to head home. Really they were only staying through Saturday but I'm sure it was a relief for all of them to get back. They all worked way too hard.


Michelle and I stayed through the end of the day Sunday and ending up putting up the fascia board, the second floor wall sheathing, the roof felt, the first floor house wrap and installed the doors and windows.



It was a lot to bite off and proved to be too much to chew in the time allowed. It is however about a quarter of the way complete in just 4 and a half days and it couldn't have happened without the help of our terrific family. The goal was to get it dried in and it's practically there.

Next weekend we plan to measure for the upper triangular loft windows, finish the wrap, and put on the roof shingles. We will also build the interior bathroom and kitchen walls.

Then will come the siding, the front porch and the attached outdoor kitchen. Then finally finishing the interior.

Won't be long now and we'll be out of the camper and have a great place to stay while we build the big house!